Bridging the Gap in Construction

In the construction industry, the only way to sendup of hundreds of thousands tiny little vectors or
information from the main office to the field wascoordinates that can be transferred to match up
to put it on a piece of paper, relying on your fieldwith what is real time in the field. BIM Positioning is
crews to interpret those drawings to create whatthe process by which we find that information in
is intended to go in the ground and become whatthe field with a total station. How does 1/16th of
is supposed to be a building of some kind. I havean inch accuracy suit you? How does 60%
watched so many companies over the yearsincrease in productivity or 4 times faster sound?
create magnificent 3D models of a buildings; MEP,Layout is the key to BIM in the field. If we don't
walls, and steel, that it made the hair on the backknow exactly where it belongs, then we will put it
of my neck stand on end to see them take thatin the wrong place...as we are doing everyday.
information and place it on a piece of white paperCoring, chipping, saw cutting; do these words ring
only to get marked up and destroyed in the field.a bell? It become a thing of the past and so will
This does not have to happen anymore... in fact, ityou if you don't get on board with this process.
never has had to happen. It's just the way thingsHundreds of contracting firms nationwide are
have been done since the beginning of time. Ialready investing in this. Why? Because it works
would like to make it known, that there is a waythat's why! BIM Positioning is the fore front of
to bridge that gap, electronically, from the officeevery project. It doesn't stop there. So we can
to the construction trailer. The age of the BIM orfind out where it goes in the field by transferring
building information model, is here to stay andinformation from the office to the field; how
those who are not up to speed will fall behind.about transferring it from the field to the office!
However, BIM is so complex and has so muchLaser scanning is providing the fastest AS-Builts
depth. What I am focusing on is taking theand most accurate Reverse Engineered drawings.
AutoCad drawing and leaving it in its electronic,No more chicken scratch and lame drawings. This
perfect form, and transferring that information tois the real thing. A 3D image, measurable to
the field on a hand held computer.millimeter accuracy. Try doing that with a tape
What am I talking about? Robotic total stations.measure. This in turn also becomes an excellent
Relying on the AutoCad drawing is what we do indeliverable for the GC and the owner.
the first place. If you have a company thatBIM Positioning is changing the way we do things
doesn't produce good drawings, it's not thein the field. Get up to speed or get left behind.
program, it's the designer. That drawing is made